Stadtwerke Flensburg - Kraftwerksführung
Experience the energy transition up close The Flensburg city utilities will decarbonize the entire Flensburg heating supply by 2035. 10 years earlier than required by the Climate Protection Act. The basis is a comprehensive transformation plan with all measures and dates. The city utilities supply more than 90% of the citizens with district heating from their combined heat and power plant, and through the complete reconstruction of the power plant, all of these will be supplied in a decarbonized manner. An opportunity and a challenge at the same time. Do you want to know how the city utilities are doing this and learn more about the company and the Flensburg combined heat and power plant? Then sign up here for the exciting power plant tour. After a short film, you will learn more about the company, the operation of the power plant, and the technical facilities during a tour. During the tour, you will visit our state-of-the-art gas and steam turbine systems, the central control room, and more. For example, the construction of our large heat pump, which is set to go into operation in 2027 and will produce CO₂-neutral district heating using harbor water and electricity from renewable energies. Enjoy the tour! For schools from 7th grade.
Dates
Good to know
Categories
Guided Tour

